5-8 Extreme Networks Consolidated Hardware Guide
Summit Switch Installation
Verifying a Successful Installation
After you supply power to the Summit switch, the switch performs a power-on self test
(POST).
During the POST, all ports are temporarily disabled, the packet LED is off, the power
LED is on, and the MGMT LED flashes. The MGMT LED flashes until the switch
successfully passes the POST.
If the switch passes the POST, the MGMT LED blinks at a slow rate (one blink per
second). If the switch fails the POST, the MGMT LED shows a solid yellow light.
Note: See Chapter 4 for more information about Summit LEDs.